ICS 27.140
CCS P 59 备案号:J2133— 2016
中国电力企业联合会标准
P T/CEC 5070—2022
海水抽水蓄能电站设计导则
Guide for design of sea-water pumped storage power
station
2022-10-26 发布 2023-02-01 实施
中国电力企业联合会 发布 T/CEC
《电子编加稿件》
XM95148 责编:谭学奇
成品:140*203 责校:马宁
版心:104*160 字数:28*29 行
天25 地 18 订 19 切 17
,描图:10 个
全国团体标准信息平台10mm
10 21mm
T/CEC 5070—2022
定价:62.00 元
全国团体标准信息平台
中国电力企业联合会标准
海水抽水蓄能电站设计导则
Guide for design of sea-water pumped storage power
station
T/CEC 5070—2022
主编机构: 中国电力企业联合会
批准机构: 中国电力企业联合会
施行日期: 2023年02月01日
中国电力出版社
2023 北 京
全国团体标准信息平台
中国电力企业联合会标准
海水抽水蓄能电站设计导则
Guide for design of sea-water pumped storage power
station
T/CEC 5070—2022
*
中国电力出版社出版、印刷、发行
(北京市东城区北京站西街 19号 100005 http://www.cepp.sgcc.com.cn )
*
2023年2月第一版 2023年2月北京第一次印刷
850毫米×1168 毫米 32开本 3印张 78千字
*
统一书号 155198·4624 定 价62.00元
版 权 专 有 侵 权 必 究
本书如有印装质量问题,我社营销中心负责退换 全国团体标准信息平台T/CEC 5070—2022
I 前 言
本导则根据《2019 年第一批中国电力企业联合会标准制订计
划的通知》 (中电联标准〔2019 〕86 号)的要求进行编制。标准
编制组经广泛调查研究,结合国家重点研发计划《海水抽水蓄能
电站前瞻技术研究》成果,以及港工、核电等工程设计经验,邀请了建设运营单位、勘察设计单位相关专家进行评审、把关,并在广泛征求意见的基础上,制订本导则。
本导则共分 12 章,主要技术内容包括:总则、术语、水文气
象、规划、工程地质勘察、工程总布置及水工建筑物设计、水力机械设计、电气设计、金属结构设计、供暖通风与空气调节、施工组织设计、环境保护。
本导则由中国电力企业联合会提出,由中国电力企业联合会
标准化管理中心负责日常管理,由中国电力企业联合会抽水蓄能标准化技术委员会(CEC/TC 03 )负责具体技术内容的解释。执
行过程中如有意见或建议,请寄送中国电力企业联合会标准化管理中心(北京市白广路二条一号,100761 ) 。
本标准主要编写单位:广东省水利电力勘测设计研究院有限公司
本标准主要参编单位:南方电网调峰调频发电有限公司 本标准主要起草人:吴新平 滕 军 李定林 吴林波 吴秋芳 陈 满 章 鹏 张 羽 王殿春 陈志伟 郭建设 林文婧 薛继乐 黄 勇 陈仕贝 谢小辉 姜 南 李珍祥 龚 芳 刘力捷 曾俏俏 郑悦华 范丽芳 彭煜民 高彦明 向正林 本标准主要审查人:汪 毅 张亚武 张正平 于亚军
全国团体标准信息平台T/CEC 5070—2022
II 李德华 祁生文 宋守平 李 冰
蒋逵超 赵 轶 陈顺义 周建新
严 丽 史济民 周建旭 贾 巍
邱树先 杨铁荣 刘殿海
全国团体标准信息平台T/CEC 5070—2022
III 目 次
1 总 则 ·····························································································1
2 术 语 ·····························································································2
3 水文气象 ·····················································································3
4 规 划 ·····························································································4
4.1 一般规定 ··············································································4
4.2 工程任务和建设必要性 ·······················································4
4.3 站址选择 ··············································································4
4.4 装机容量选择 ·······································································5
4.5 海洋侧特征潮水位选择 ·······················································5
4.6 运行方式与能量指标 ···························································5
5 工程地质勘察 ·············································································6
6 工程总布置及水工建筑物设计 ··················································8
6.1 一般规定 ··············································································8
6.2 工程总布置 ··········································································8
6.3 上水库 ··················································································9
6.4 输水系统 ············································································10
6.5 厂区及厂房布置 ·································································12
6.6 尾水围护 ············································································13
6.7 水工结构防腐、防海生物污损设计 ··································14
6.8 安全监测 ············································································15
7 水力机械设计 ···········································································17
7.1 一般规定 ············································································17
7.2 水泵水轮机 ········································································17
7.3 进水阀 ················································································18
7.4 技术供水系统、排水系
T-CEC 5070—2022 海水抽水蓄能电站设计导则
文档预览
中文文档
12 页
50 下载
1000 浏览
0 评论
0 收藏
3.0分
温馨提示:本文档共12页,可预览 3 页,如浏览全部内容或当前文档出现乱码,可开通会员下载原始文档
本文档由 思安 于 2023-06-03 00:20:58上传分享